KUNSTENPAND – HART VAN ZUID

CLIENT:

Hart Van Zuid V.O.F

ADDRESS:

Gooilandsingel 7, 3083 DP Rotterdam

BUILT SURFACE:

c.a 18.000 sqm

DURATION:

12 months

PROJECT DESCRIPTION:

Being a Part of Hart Van Zuid Project of Rotterdam City Hall, Kunstenpand replaces existing Artcenter in Zuidplein, Rotterdam. Comprised of Theater, Library and Catering zones, the core building structure is made of three reinforced concrete halls highest of which having a height of 25.15 m, constructed by climbing formwork systems.

Type of works: Reinforced Concrete Works and Prefabricated Items Installation Workmanship

Functionality of the project: Art Center (theater, concert hall,library)